Bridlington rBWD

Contract Works:

- Caisson shaft & cover slab (10.5m ø, 13m deep).

- Shaft 1 – Jacked Caisson (10.5m ø – 12m Deep)

- Shaft 2 – Jacked Caisson (7.5m ø – 11m Deep)

- Shaft 2A – Jacked Caisson (4.0m ø – 11m Deep)

- Shaft 6 – Jacked Caisson ( 6.0m ø – 11m Deep)

- Tunnel labour supply (2.07m ø – 805m Long)

- Pipejack connection – Shaft 2 – Shaft 2A – (1.2m ø – 10m long)

- Pipejack connection – Shaft 6 – Terminal Pumping Station – (1.5m ø – 20m long)

- LSO Drive Pit – Terminal Pumping Station – Pipejack connection (1.8m ø – 20m long)

- LSO Timber heading & ‘rib and lagging’ insitu lining.

- Pumping station – CS0 chamber connection (1.2m ø – 15m long)

- Shaft 1, 2, 2A and 6 concrete benching.

- Shaft 1, 2, 2A and 6 PCC cover slab installation.